Rust PopulationField survey · Rust servers
Observing 86,398 players 11,795 servers 3,928 with someone on 157 fresh wipes in 3 h counted every five minutes
‹ All serversspecimen record
Specimen recordcat. no. 15,452habitat unknownfirst seen 13 Sep 2026

MS Project | SOLO/DUO

Online 80.221.91.195:28015 checked 11m ago

moddedcarbon

Measurements

Players now
0/ 25
0% full
7-day average
0
peak –
Rank
#15,452
top 69%
Last wipe
12d ago
no schedule published
Next wipe
–
no rhythm it keeps
Obs. 1 · sightings

Players

AveragePeak
0123417:0002:0011:0020:0005:0014:00

Hourly average and peak, UTC.

Obs. 2 · condition

Server performance

010020030040017:0002:0011:0020:0005:0014:00

48 hours: hourly readings. 30 to 90 days: one point a day, with the day's average and lowest fps, most entities and most memory, measured since 17 Sep. From asking the server directly; low fps and a climbing entity count mean lag.

Obs. 3 · standing

Rank

daily · 1 is best
RankRank in region
15k10k15k20k20 Sep27 Sep3 Oct15 Oct21 Oct28 Oct

Top 69% of all ranked servers. Ranked on player hours over the last seven days.

Obs. 4 · the wipe cycle

Wipe schedule

no rhythm it keeps

Its wipes keep no rhythm, so there is no next wipe to predict. Every server wipes at the monthly force wipe.

14 days
usual gap
between real wipes
0%
on rhythm
of its recent wipes
1
wipe-day peak
players, last three wipes
0%
crowd held
else halves by day 1

The first 48 hours of its last wipes

Thu 15 OctSat 26 SepThu 17 Sep
00.250.50.751+0h+9h+19h+28h+38h+47h

Players each hour, from the hour of the wipe. The latest peaked at 0, 0 hours in.

Log · wipes seen

Wipes

newest first
WipedPeakCrowdLastedPlayers before
Thu 15 Oct, 20:05 UTC12d ago 0 – running 0
Sat 26 Sep, 09:07 UTC32d ago 1 halved by day 1 19.5 days 1
Thu 17 Sep, 20:03 UTC40d ago 1 halved by day 1 8.5 days 0

Peak: the most players in the first 48 hours. Crowd: whether every day of the wipe kept at least half that peak, or the day it fell below. A new world less than six hours after a wipe is a restart, not a wipe of its own.

Field questions

Quick answers

from the figures on this page

Player counts

How does MS Project | SOLO/DUO rank against other Rust servers?

Over the past week it ranks #15,452 for player hours, which puts MS Project | SOLO/DUO in the top 69% of all ranked servers.

How busy is MS Project | SOLO/DUO?

MS Project | SOLO/DUO holds 0 players at the moment, out of 25 slots. A seven-day average of 0 players was counted here.

Tags

What do the server tags on MS Project | SOLO/DUO mean?

What the game's server browser reads from MS Project | SOLO/DUO is this set of tags: gmrust (Game mode): The game mode is standard Rust survival; mp25 (Max players): The server has 25 slots; ts8 (Group limit): This is the game default: at most 8 per team; v2633 (Protocol): The protocol is 2633; a different version will not connect; cs162929 (Build): This server runs game build 162929; ptrak (Networking): The standard network layer, RakNet, is in use; $r? (Region code): The region code is left blank; ^z (Modded): This server appears under Modded because plugins or settings alter the game; ^y (Carbon): A plugin framework, Carbon, is in use. Player count now, queue length and the making of the world all sit in the tags as well, and the top of this page shows them.

Which Rust Population lists and filters include MS Project | SOLO/DUO?

These Rust Population lists include MS Project | SOLO/DUO: Modded Rust servers, counted. Filter the server list by Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more; Last wipe: In the last 2 weeks and it will show up.

Wipe schedule

What does wipe day look like on MS Project | SOLO/DUO?

Averaged over recent wipes, 1 players were counted at the busiest point. Peak came 0 hours into the latest wipe. Half that peak held until the next wipe in 0% of its recent wipes. The crowd dropped below half by day 1 when it did not hold.

What is the wipe schedule on MS Project | SOLO/DUO?

There is no next wipe to predict: MS Project | SOLO/DUO wipes at irregular times. On Thursday 5 November at 19:00 UTC the monthly force wipe comes round, and every Rust server wipes with it. 12 days 20 hours ago the current world was made.

Settings

Which map does MS Project | SOLO/DUO run?

A procedural map of size 3,500 from seed 150644954, generated by the game, is in use on MS Project | SOLO/DUO. You can look at it on RustMaps from this page: size and seed determine the map.

What are the rules and settings on MS Project | SOLO/DUO?

No gather rate appears in the name of MS Project | SOLO/DUO. The group limit is 8 players, which is the default. survival is what it runs, gather, build and raid, as in the standard game. You can raid and fight other players here. The server browser files it under Modded, where plugins or settings alter the game. Carbon plugins are in use here. VAC, Valve's anti-cheat, runs here.

Server details

Which version of Rust does MS Project | SOLO/DUO run?

On Linux, MS Project | SOLO/DUO runs Rust network protocol 2633 and build 162929. Steam updates your game automatically, but you need the same protocol to join.

Does MS Project | SOLO/DUO run smoothly?

It ran at 237 server fps on average over the last 48 hours, and never went below 227. The entity count reached 72,127: buildings, deployables and all other objects. Memory use peaked at 2,984 MB. What players experience as lag comes from low fps and a rising entity count.

Is MS Project | SOLO/DUO online, and how reliable is it?

You will find MS Project | SOLO/DUO online now. Judging by the uptime it reports, the last restart was about 4 hours ago. Over the last 7 full days, 168 of 168 hours were online, or 100%. The first sighting by Rust Population was on 13 September 2026.

Where is MS Project | SOLO/DUO located?

A region is not published by MS Project | SOLO/DUO. What Rust Population shows is where a server says it is; where the machine actually stands is not looked up. You will find it at 80.221.91.195:28015.

How to join

How do I join MS Project | SOLO/DUO?

Either enter client.connect 80.221.91.195:28015 in Rust's console after pressing F1, or use Launch Rust here to open Rust through Steam and be connected.

Key to its markings

Server tags

what each one means

Published as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y

Game

gmrust
Game mode The game mode is standard Rust survival.
mp25
Max players The server has 25 slots.
ts8
Group limit This is the game default: at most 8 per team.
v2633
Protocol The protocol is 2633; a different version will not connect.
cs162929
Build This server runs game build 162929.
ptrak
Networking The standard network layer, RakNet, is in use.
$r?
Region code The region code is left blank.

Mods and access

^z
Modded This server appears under Modded because plugins or settings alter the game.
^y
Carbon A plugin framework, Carbon, is in use.

Players now (cp), the queue (qp) and the wipe time (born) are in the tag string too; they change every few minutes and are shown at the top of the page. Flag meanings are Facepunch's.